The Ping River continues to rise, causing water to overflow the banks and flood residential and commercial areas. The water level is almost 2 meters high after heavy rain. The Pa Phrao Nok community is suffering greatly after the water quickly flooded the area. They must now use boats to transport people and belongings in and out of the area after the water level rose to chest height or almost 2 meters, the same as last time. Meanwhile, many tourists are still stranded in the area. The sick have been moved to a safe area. There are also other communities that are flooded, such as Chiang Mai Land and Chang Klan Road, where the water is more than 1 meter high, causing many cars to be submerged in the middle of the road after the water overflowed at 11 pm last night (October 3) and rose rapidly at 2 am until now, spreading to flood many communities. In Ban Pa Phrao Nok and Chiang Mai Land, which has a care center for the elderly, they requested assistance from rescue workers from the Chiang Mai Kuson Songkhro Association to help move a grandmother who has asthma from the flooded care center to safely take her to the hospital. While the Ping River level is still rising continuously, higher than ever before and may reach 5 meters because there will be a mass of water from Mae Taeng and Mae Rim, plus the rain is still falling harder and there is no sign of stopping. Source: Thai News Agency
The Ping River overflowed its banks and flooded community areas and commercial areas.
Recent News
Lin Chung-wei Wins Bronze in Men’s 400-Meter Hurdles at Asian Games
September 28, 2026
Taiwan Secures 33 Medals at 2026 Aichi-Nagoya Asian Games
September 28, 2026
Fu Chao-hsuan Wins Historic Gold in High Jump at Asian Games
September 28, 2026
East Asia Super League 2026-27 Season to Open in Cebu
September 28, 2026
Taiwanese Tech Firms Host Major Recruitment Event in Silicon Valley
September 28, 2026
Morocco Resumes Visa Applications for Taiwanese Tourists
September 28, 2026
Taiwan’s VIS and NXP Semiconductors Begin Production at Singapore Chip Plant
September 28, 2026